Vendor : aFe
Product Type : Intercoolers
Sku : AFE46-20684-R
Couldn't load pickup availability
aFe POWER BladeRunner Charge Pipe Kit feature smooth transitions in the mandrel-bent aluminum pipes to decrease turbulence and minimize pressure loss, lowering operating temperatures and increasing power. The factory-style billet aluminum quick-connect adaptors with o-ring seals ensure a leak-free fit while maintaining superior strength and durability. The premium stainless-steel hardware and heavy-duty 5-ply polyester reinforced silicone couplings are designed to withstand high vibration and heat tolerance for an added security. Finished in a powder coated surface and laser-etched aFe POWER logo these charge pipes provide a custom look.
Installation InstructionsThis Part Fits:
| Year | Make | Model | Submodel |
|---|---|---|---|
| 2023-2025 | Ford | F-250 Super Duty | King Ranch |
| 2023-2025 | Ford | F-250 Super Duty | Lariat |
| 2023-2024 | Ford | F-250 Super Duty | Limited |
| 2023-2025 | Ford | F-250 Super Duty | Platinum |
| 2023-2025 | Ford | F-250 Super Duty | XL |
| 2023-2025 | Ford | F-250 Super Duty | XLT |
| 2023-2025 | Ford | F-350 Super Duty | King Ranch |
| 2023-2025 | Ford | F-350 Super Duty | Lariat |
| 2023-2024 | Ford | F-350 Super Duty | Limited |
| 2023-2025 | Ford | F-350 Super Duty | Platinum |
| 2023-2025 | Ford | F-350 Super Duty | XL |
| 2023-2025 | Ford | F-350 Super Duty | XLT |
We will be temporarily closed from Monday 10th August until Friday 21st August 2026 while we relocate to our new premises and carry out our annual stock take. Our website will remain open and you are welcome to place orders during this period. However, new orders placed between 11th and 21st August will not be processed or dispatched until we reopen. Please note: Any orders currently open and already in our system will continue to be processed as normal and will not be affected by the temporary closure. If you have an urgent order or require something that cannot wait until we reopen, please contact us via our website chat or email. We will do our best to assist wherever possible. Normal service will resume on Saturday 22nd August 2026. We apologise for any inconvenience this may cause and greatly appreciate your patience and continued support while we complete our relocation and annual stock take. Thank you for your understanding and continued support.
