Vendor : QA1
Product Type : Subframes
Sku : QAP52092
Couldn't load pickup availability
Product Overview The 68-72 X-body was designed in an era when high-performance driving and modern tire technology weren't as prevalent. Their unibody chassis, while innovative at the time, can flex and twist under stress, particularly when cornering aggressively or accelerating hard. QA1's bolt-in sub-frame connectors offer a simple and effective solution to this common issue. Reduced Chassis Flex QA1's sub-frame connectors tackle the flex issue by increasing frame rigidity, leading to a significant improvement in handling performance, especially during cornering, acceleration, and braking. The tubular design connects the front subframe to the rear subframe, providing additional structural support and stiffness to the chassis. Includes Solid Body Mounts and Hardware The included solid body mounts further reduce chassis flex. Their aluminum construction offers a noise free alternative to polyurethane. Thoughtful Design The QA1 subframe connector contours to follow the body lines for a factory-like look without sacrificing ground clearance. Easy Bolt-in Installation Bolt-in installation makes the upgrade hassle-free. Made in the USA QA1 suspension is proudly made in Lakeville, Minnesota.
Installation InstructionsThis Part Fits:
| Year | Make | Model | Submodel |
|---|---|---|---|
| 1968 | Chevrolet | Chevy II | Nova |
| 1969-1972 | Chevrolet | Nova | Base |
| 1971-1972 | Pontiac | Ventura | Base |
We will be temporarily closed from Monday 10th August until Friday 21st August 2026 while we relocate to our new premises and carry out our annual stock take. Our website will remain open and you are welcome to place orders during this period. However, new orders placed between 11th and 21st August will not be processed or dispatched until we reopen. Please note: Any orders currently open and already in our system will continue to be processed as normal and will not be affected by the temporary closure. If you have an urgent order or require something that cannot wait until we reopen, please contact us via our website chat or email. We will do our best to assist wherever possible. Normal service will resume on Saturday 22nd August 2026. We apologise for any inconvenience this may cause and greatly appreciate your patience and continued support while we complete our relocation and annual stock take. Thank you for your understanding and continued support.
