Vendor : Skyjacker
Product Type : Lift Kits
Sku : SKYG350RKXLT
Couldn't load pickup availability
Engineered for higher speed applications, remote reservoir shocks still perform at crawl. The external remote reservoir separates the nitrogen gas from the oil with an Internal Floating Piston (IFP). The majority of the reservoir contains pressurized nitrogen gas. The IFP prevents the gas and oil from mixing or foaming (cavitation).Longer replacement Front Lower Control Link Arms corrects caster angle. The inward offset bend improves tire clearance to maximize turning radius. Longer replacement Rear Upper Control Link Arms correct rear drive shaft pinion angle.Formed from 2- in. OD x 0.250 wall DOM tubing, both pairs of arms have pressed-in HD OEM style vulcanized rubber bushings at each end.A replacement Front Adjustable Track Bar includes pressed-in HD OEM style rubber bushing and an adjustable 3/4- in. Heavy-Duty Rod End, Jam Nut and Alignment Bushings.Front and Rear Bump Stop Spacers bolt onto the axle bump pads and keep the suspension travel safely in check. Extended Length Sway Bar End Links allow full articulation at full droop. The front end links include Skyjacker installed pressed-in HD OEM style rubber bushings. The rear end links come with press-in Poly bushings.
Installation InstructionsThis Part Fits:
| Year | Make | Model | Submodel |
|---|---|---|---|
| 2020-2024 | Jeep | Gladiator | Rubicon |
| 2024 | Jeep | Gladiator | Rubicon X |
We will be temporarily closed from Monday 10th August until Friday 21st August 2026 while we relocate to our new premises and carry out our annual stock take. Our website will remain open and you are welcome to place orders during this period. However, new orders placed between 11th and 21st August will not be processed or dispatched until we reopen. Please note: Any orders currently open and already in our system will continue to be processed as normal and will not be affected by the temporary closure. If you have an urgent order or require something that cannot wait until we reopen, please contact us via our website chat or email. We will do our best to assist wherever possible. Normal service will resume on Saturday 22nd August 2026. We apologise for any inconvenience this may cause and greatly appreciate your patience and continued support while we complete our relocation and annual stock take. Thank you for your understanding and continued support.
