Vendor : AWE Tuning
Product Type : Axle Back
Sku : AWE3025-43065
Couldn't load pickup availability
In axle-back form, the SwitchPath™ retains the M5’s factory mid-section, coming in right at the rear axle. The AWE SwitchPath™ Axle Back Exhaust maintains a 3” diameter, shaves weight from the rear, and retains the factory valve behavior. Available separately are the AWE Performance Mid Pipes to replace the factory mid section with a 3” stainless steel X-pipe, mating to the factory Axle Back (or AWE Axle Back, to make a full cat back). And if you're not ready to do the mid-pipes, no sweat - AWE engineered the Exhaust Suite for the M5 as a completely modular configuration that allows you to do just that, at any time. Simply add the desired configuration to your cart, and roar away. All tip options are AWE's 4" slash-cut design, and include the AWE logo and double-walling to ensure a mirror finish even under hard usage. All tips are individually adjustable, allowing depth into the bumper to be set according to personal taste.Important fitment notes: If you're equipping the Performance Mid Pipes or an Axle Back, cutting will be required. The Performance Mid Pipes + Axle Back installed together will not require cutting.
Installation InstructionsThis Part Fits:
| Year | Make | Model | Submodel |
|---|---|---|---|
| 2018-2023 | BMW | M5 | Base |
| 2019-2021 | BMW | M5 | Competition |
| 2022 | BMW | M5 | CS |
We will be temporarily closed from Monday 10th August until Friday 21st August 2026 while we relocate to our new premises and carry out our annual stock take. Our website will remain open and you are welcome to place orders during this period. However, new orders placed between 11th and 21st August will not be processed or dispatched until we reopen. Please note: Any orders currently open and already in our system will continue to be processed as normal and will not be affected by the temporary closure. If you have an urgent order or require something that cannot wait until we reopen, please contact us via our website chat or email. We will do our best to assist wherever possible. Normal service will resume on Saturday 22nd August 2026. We apologise for any inconvenience this may cause and greatly appreciate your patience and continued support while we complete our relocation and annual stock take. Thank you for your understanding and continued support.
