Vendor : Banks Power
Product Type : Performance Monitors
Sku : GBE66544
Couldn't load pickup availability
Connects to your iDash to add 4 Sensor inputs per module. Works with a wide variety of Banks plug and play sensors as well as with your custom analog or resistance sensor. Each channel can be configured to any parameter. The 4-Ch Analog Module Connects to your iDash and add 4 Sensor inputs per module. The system works with a wide variety of Banks plug and play sensors as well as with your custom analog or resistance sensor. Each channel can be configured to any parameter making this a very flexible module. Daisy chain up to 6 Thermocouple Modules and 6 Analog Sensor Modules per system allowing you to add over 48 new sensors to your Banks iDash DataMonster or SuperGauge.Key Features: The 4-Ch Analog Module. Connects to your iDash. Adds 4 Sensor inputs per module. The system works with a wide variety of Banks plug-and-play sensors. Also works with your custom analog or resistance sensor. Each channel can be configured to any parameter making this a very flexible module. Combine with other Banks Sensor Modules to use additional sensors. Daisy chain up to 6 Thermocouple and 6 Analog Sensor Modules per system. Connects inline with Banks Derringer, and other Sensor Modules for easy connectivity.
Installation InstructionsWe will be temporarily closed from Monday 10th August until Friday 21st August 2026 while we relocate to our new premises and carry out our annual stock take. Our website will remain open and you are welcome to place orders during this period. However, new orders placed between 11th and 21st August will not be processed or dispatched until we reopen. Please note: Any orders currently open and already in our system will continue to be processed as normal and will not be affected by the temporary closure. If you have an urgent order or require something that cannot wait until we reopen, please contact us via our website chat or email. We will do our best to assist wherever possible. Normal service will resume on Saturday 22nd August 2026. We apologise for any inconvenience this may cause and greatly appreciate your patience and continued support while we complete our relocation and annual stock take. Thank you for your understanding and continued support.
