The 2-Row 42mm core greatly not only increases the fluid capacity of the radiator, but also improves the cores ability to dissipate heat. CSF's Exclusive B-Tube Technology increases the heat transfer by approximately 15% over regular oval welded tubes. In addition, the super-efficient multi-louvered fins maximize airflow through the core for the best possible performance. More cooling rows also improve the overall efficiency of the radiator. More cooling tubes means more surface area for the coolant's heat to dissipate from. Each end tank is CNC machined billet aluminum giving them incredible strength and durability. CNC machining offers incredible precision and uniformity. The results are perfectly produced end tanks that perfectly match up with the ends of the 42 mm core. Hand TIG welding joins the tanks to the core creating the strongest radiator on the market for the R32 Skyline. Each radiator includes a 1.4 bar high pressure cap with an embossed CSF logo. High pressure radiator caps raise the boiling point of coolant. This helps protect the system from boiling over at higher operating temperatures. While the radiator is designed to keep the system from reaching such temperatures, it is always good to have extra protection for situations where the coolant gets too hot. The CSF #7217 comes in a raw billet aluminum finish. Also available in Black (CSF #7217B).
Add to cartSold out
Choosing a selection results in a full page refresh.
Great Service very knowledgeable staff, my ram is running perfect
Steve Rooney
This company lies to you. Ordered a 02 sensor from APPD for my C7 Vette. Paid the highest possible courier service for the fastest possible shipping from Newcastle to France. I needed the part urgently. Ordered at the weekend and called them Monday to confirm all was in hand and explained the part was required urgently. Response from APPD yes we've recieved the order and will ship as soon as its been processed. Called every day for the next 7 days to be told yes its been shipped and this is the shipping number. Turned out it took them till Friday ..5 days later to post it and then the package lay at the courier another week or so. APPD lied to me throughout this whole transaction. The package cleared customs in 2 days and should have been with me in just over week and not over 4 weeks. APPD offereed the postage refunded after I had to start a PAYPAL dispute.. This should have been a straight forward simple part delivery.When it goes wrong you shouldn't lie to your customer. A serious compay would refund the customer not try to fuzz the truth and blame everyone else. I refused the postage delivery refund so you can buy some honesty pills and discuss with your team how to avoid more negative service feedback. If your thinking of ordering parts from APPD scroll on and find another supplier. You dont need or want the hassle of dealing with these people.
wade Patout
Over a month waiting on parts and all I get is it will scan soon week after week. Reordered from US so I could finish build and same parts arrived in one week. Waiting to see if they will refund??
Gareth weare
placed an order for parts 13th of feb, all listed in stock, got shipping update for label created on the 16th of feb. I have still not received what I ordered and paid for, no updates. I have been getting the same generic answer "order will be fulfilled today" for nearly 2 months now when trying to enquire. Quite disappointing as I have been unable to finish off my car due to waiting on the final fuel system parts for over 2 months now.
PHILIP HYDE
I initially ordered the wrong part but managed to change the order before it was sent out. Lovely product Really well made.
Chris Impey
Made my first purchase with these guys, very helpful and quick replies to my questions.
Delivery was very quick, will be using again
AAAAAA++++++++
Julian Boulter
Brilliant communication, bought parts very difficult to source in the UK, this was the only supplier who managed to get them for me...top service!!!