Vendor : FAST
Product Type : Intake Manifolds
Sku : FST303010
Couldn't load pickup availability
FAST Gen III Hemi Supercharger/Camshaft Power Packages provided the perfect paring of products for enthusiasts to gain a 1,000+ hp potential from their Dodge. These Power Packages feature Edelbrock's 2650 TVS supercharger with patented, dual-pass, 3-core integrated intercooler, and COMP Cams' LST camshaft designed for supercharger applications. FAST Gen III Hemi Power Packages have all the basics required to install the supercharger, but necessary accessory items such as fuel injectors, air intake, and heat exchanger pump are left up to the installer, providing total flexibility for custom installations.FAST Edelbrock/COMP Cams Power Packages include:2650 TVS supercharger--patented integrated intercooler with 45 percent more cooling area and the ability to generate major power gains through lower inlet air charge temperaturesSupercharger pulleys: -- 3.500 in. is pump gas-friendly supercharger pulley for engine break-in, initial tuning, and general performance driving -- 2. 625 in. when maximum power is desired on race fuel or E85Accessory drive pulleysFuel lines and railsLow Shock Technology camshaftPhaser limiterPushrodsConical valve springsChromoly steel retainersValve locks and sealsSpring seats and shimsInstallation hardware
User 2We will be temporarily closed from Monday 10th August until Friday 21st August 2026 while we relocate to our new premises and carry out our annual stock take. Our website will remain open and you are welcome to place orders during this period. However, new orders placed between 11th and 21st August will not be processed or dispatched until we reopen. Please note: Any orders currently open and already in our system will continue to be processed as normal and will not be affected by the temporary closure. If you have an urgent order or require something that cannot wait until we reopen, please contact us via our website chat or email. We will do our best to assist wherever possible. Normal service will resume on Saturday 22nd August 2026. We apologise for any inconvenience this may cause and greatly appreciate your patience and continued support while we complete our relocation and annual stock take. Thank you for your understanding and continued support.
