Vendor : Go Rhino
Product Type : Running Boards
Sku : GOR69400057ST
Couldn't load pickup availability
The RB20 Slim Line Running Boards offer the same heavy duty toughness as the original RB Series, but with a slimmer design that fits tighter along the cab for increased ground clearance when off-roading. Constructed from 16-gauge zinc-coated galvanized steel, the Raptor-inspired boards were built to protect your panels from flying debris while providing a full-length step platform. The modern, bullet-stamped design is 5 1/2 inches across at its widest point (compared with 7 1/2 inches of the original RB20) and are offered in cab-length sizes that fit most popular trucks, Jeeps and SUVs. RB10 Slim Running Boards come with a Limited Lifetime warranty on materials and construction and a 5 year warranty on the Bedliner Finish.
Installation InstructionsThis Part Fits:
| Year | Make | Model | Submodel |
|---|---|---|---|
| 2021-2026 | Ford | Bronco | Badlands |
| 2021-2023,2025-2026 | Ford | Bronco | Base |
| 2021-2025 | Ford | Bronco | Big Bend |
| 2021-2024 | Ford | Bronco | Black Diamond |
| 2022-2024 | Ford | Bronco | Everglades |
| 2021 | Ford | Bronco | First Edition |
| 2023-2025 | Ford | Bronco | Heritage Edition |
| 2023-2024 | Ford | Bronco | Heritage Limited Edition |
| 2021-2025 | Ford | Bronco | Outer Banks |
| 2022-2025 | Ford | Bronco | Raptor |
| 2025 | Ford | Bronco | Stroppe Edition |
| 2021-2024 | Ford | Bronco | Wildtrak |
We will be temporarily closed from Monday 10th August until Friday 21st August 2026 while we relocate to our new premises and carry out our annual stock take. Our website will remain open and you are welcome to place orders during this period. However, new orders placed between 11th and 21st August will not be processed or dispatched until we reopen. Please note: Any orders currently open and already in our system will continue to be processed as normal and will not be affected by the temporary closure. If you have an urgent order or require something that cannot wait until we reopen, please contact us via our website chat or email. We will do our best to assist wherever possible. Normal service will resume on Saturday 22nd August 2026. We apologise for any inconvenience this may cause and greatly appreciate your patience and continued support while we complete our relocation and annual stock take. Thank you for your understanding and continued support.
