Vendor : Hotchkis
Product Type : Chassis Bracing
Sku : HOT4009
Couldn't load pickup availability
Hotchkis Sport Suspension 4009 1968-1974 Nova Sub Frame Connectors. The Hotchkis Performance sub-frame connectors for 68-74 X-Body cars are designed to add rigidity to the chassis to improve vehicle performance by reducing chassis flex. Fabricated from 1.5 in. x 2.5 in. .120 wall rectangular steel these TIG-welded connectors are powder coated gloss black and include urethane front body mounts. Installation of these connectors does not require modifications or cutting of the floor boards. The rear mount is a weld in while the front mount is a bolt in with the option to weld. This is a must have finishing touch for any high performance application. Features: Powder Coated Gloss Black Finish TIG-welded Fabricated from 1.5 in. x 2.5 in. .120 wall rectangular steel. Urethane front body mount included Rear mount is weld in front mount is bolt in with option to weld. Does not require cutting or modifying the floor. Benefits: Improves vehicle handling. Improves vehicle traction. Reduced chassis flex.
Installation InstructionsThis Part Fits:
| Year | Make | Model | Submodel |
|---|---|---|---|
| 1968 | Chevrolet | Chevy II | Nova |
| 1969-1974 | Chevrolet | Nova | Base |
| 1973-1974 | Chevrolet | Nova | Custom |
| 1971-1974 | Pontiac | Ventura | Base |
| 1973-1974 | Pontiac | Ventura | Custom |
| 1974 | Pontiac | Ventura | GTO |
We will be temporarily closed from Monday 10th August until Friday 21st August 2026 while we relocate to our new premises and carry out our annual stock take. Our website will remain open and you are welcome to place orders during this period. However, new orders placed between 11th and 21st August will not be processed or dispatched until we reopen. Please note: Any orders currently open and already in our system will continue to be processed as normal and will not be affected by the temporary closure. If you have an urgent order or require something that cannot wait until we reopen, please contact us via our website chat or email. We will do our best to assist wherever possible. Normal service will resume on Saturday 22nd August 2026. We apologise for any inconvenience this may cause and greatly appreciate your patience and continued support while we complete our relocation and annual stock take. Thank you for your understanding and continued support.
