Vendor : ICON
Product Type : Coilovers
Sku : ICO58771
Couldn't load pickup availability
ICON Vehicle Dynamics V.S. 2.5 Series remote reservoir front coilover shocks are an incredible upgrade for the front end of the 2022-2026 Toyota Tundra. These adjustable coilovers are specifically designed for use the ICON 6" Lift Performance Suspension System and allow up to 5-6” of front lift height adjustability, allowing the use of larger, more aggressive wheel and tire combinations. ICON’s Vehicle-specific shock length and valving along with the larger 2.5” shock body and increased piston area over stock components yield the maximum travel possible along with superior ride quality and suspension performance both on- and off-road. Reservoirs greatly increase shock oil volume and heat dissipation surface area to resist overheating and cavitation under hard use, which can lead to damper fade. When paired with ICON 2.0 or 2.5 Aluminum Series rear shock absorbers vehicle control will be balanced front to rear, resulting in the best overall driving experience for your Toyota Tundra.
Installation InstructionsThis Part Fits:
| Year | Make | Model | Submodel |
|---|---|---|---|
| 2022-2026 | Toyota | Tundra | 1794 Edition |
| 2022-2026 | Toyota | Tundra | Limited |
| 2022-2026 | Toyota | Tundra | Platinum |
| 2022-2026 | Toyota | Tundra | SR |
| 2022-2026 | Toyota | Tundra | SR5 |
| 2022-2026 | Toyota | Tundra | TRD Pro |
We will be temporarily closed from Monday 10th August until Friday 21st August 2026 while we relocate to our new premises and carry out our annual stock take. Our website will remain open and you are welcome to place orders during this period. However, new orders placed between 11th and 21st August will not be processed or dispatched until we reopen. Please note: Any orders currently open and already in our system will continue to be processed as normal and will not be affected by the temporary closure. If you have an urgent order or require something that cannot wait until we reopen, please contact us via our website chat or email. We will do our best to assist wherever possible. Normal service will resume on Saturday 22nd August 2026. We apologise for any inconvenience this may cause and greatly appreciate your patience and continued support while we complete our relocation and annual stock take. Thank you for your understanding and continued support.
