Vendor : Skyjacker
Product Type : Lift Kits
Sku : SKYJL25R3BLT
Couldn't load pickup availability
Skyjacker specifically engineered a progressive variable rate coil spring, distinctively a 2-stage dual rate long travel coil. Spring rate progression is from a 1st Flex Rate to a 2nd Ride Rate. The 1st Flex Rate stage delivers a comfortable ride with the ability to flex for increased articulation. The flex rate expands during full articulation as the suspension drops (full droop). This keeps the coil springs seated in the upper coil mount/bucket and the tires in contact with the terrain. The 2nd Ride Rate stage only engages after compression past the flex rate. Engineered to coordinate with the Wrangler's distinctive suspension handling characteristics, the rear coils are side specific. Front and Rear Bump Stop Spacers bolt onto the axle bump pads and keep the suspension travel safely in check. Front and Rear Extended Length Sway Bar End Links allow full articulation as the suspension drops (full droop). These sway bar end links include Skyjacker installed pressed-in HD OEM style rubber bushings. Proper suspension geometry ensures the Electronic Stability Control (ESC) system functions within factory parameters.
Installation InstructionsThis Part Fits:
| Year | Make | Model | Submodel |
|---|---|---|---|
| 2023-2024 | Jeep | Wrangler | Rubicon 392 |
| 2021-2022 | Jeep | Wrangler | Unlimited Rubicon 392 |
We will be temporarily closed from Monday 10th August until Friday 21st August 2026 while we relocate to our new premises and carry out our annual stock take. Our website will remain open and you are welcome to place orders during this period. However, new orders placed between 11th and 21st August will not be processed or dispatched until we reopen. Please note: Any orders currently open and already in our system will continue to be processed as normal and will not be affected by the temporary closure. If you have an urgent order or require something that cannot wait until we reopen, please contact us via our website chat or email. We will do our best to assist wherever possible. Normal service will resume on Saturday 22nd August 2026. We apologise for any inconvenience this may cause and greatly appreciate your patience and continued support while we complete our relocation and annual stock take. Thank you for your understanding and continued support.
