Vendor : Wehrli
Product Type : Intercooler Pipe Kits
Sku : WCFWCF100708-BR
Couldn't load pickup availability
WCFab 3" High Flow Driver (Hot) Side Intercooler pipe for the 2017-2019 L5P 6.6L Duramax equipped Chevrolet Silverado or GMC Sierra 2500 / 3500 HD truck. Replaces the factory two piece 2 1/2" intercooler pipe with a high flow one piece 3" pipe. It also includes upgraded silicone boots that withstand higher pressure and temperature than the factory boots to increase reliability and eliminate blown factory boots. - - Replaces the following GM Part Numbers: 87839947
Installation InstructionsThis Part Fits:
| Year | Make | Model | Submodel |
|---|---|---|---|
| 2017-2019 | Chevrolet | Silverado 2500 HD | High Country |
| 2017-2019 | Chevrolet | Silverado 2500 HD | LT |
| 2017-2019 | Chevrolet | Silverado 2500 HD | LTZ |
| 2017-2019 | Chevrolet | Silverado 2500 HD | WT |
| 2017-2019 | Chevrolet | Silverado 3500 HD | High Country |
| 2017-2019 | Chevrolet | Silverado 3500 HD | LT |
| 2017-2019 | Chevrolet | Silverado 3500 HD | LTZ |
| 2017-2019 | Chevrolet | Silverado 3500 HD | WT |
| 2017-2019 | GMC | Sierra 2500 HD | Base |
| 2017-2019 | GMC | Sierra 2500 HD | Denali |
| 2017-2019 | GMC | Sierra 2500 HD | SLE |
| 2017-2019 | GMC | Sierra 2500 HD | SLT |
| 2017-2019 | GMC | Sierra 3500 HD | Base |
| 2017-2019 | GMC | Sierra 3500 HD | Denali |
| 2017-2019 | GMC | Sierra 3500 HD | SLE |
| 2017-2019 | GMC | Sierra 3500 HD | SLT |
We will be temporarily closed from Monday 10th August until Friday 21st August 2026 while we relocate to our new premises and carry out our annual stock take. Our website will remain open and you are welcome to place orders during this period. However, new orders placed between 11th and 21st August will not be processed or dispatched until we reopen. Please note: Any orders currently open and already in our system will continue to be processed as normal and will not be affected by the temporary closure. If you have an urgent order or require something that cannot wait until we reopen, please contact us via our website chat or email. We will do our best to assist wherever possible. Normal service will resume on Saturday 22nd August 2026. We apologise for any inconvenience this may cause and greatly appreciate your patience and continued support while we complete our relocation and annual stock take. Thank you for your understanding and continued support.
